Skip to content
Mock demo · simulated data

Stop log

Every stop carries a reason from a controlled list, so the Pareto is built from structured records, not free text. Record one below to see how it lands in the log.

Record a stop

Events

1016 stops · 506.8 h

Downtime events with line, shift, reason and minutes
EventDateLineShiftReasonGroupMin
DT-02522026-09-25L1NightOperator adjustmentMinor stop2
DT-10132026-09-25L4NightLabel or print faultMinor stop6
DT-09302026-09-25L4EveningOut-of-tolerance adjustmentQuality hold36
DT-06772026-09-25L3EveningWaiting for materialMaterial15
DT-01652026-09-25L1EveningBearing or drive failureEquipment failure117
DT-06792026-09-25L3EveningFirst-off approval waitQuality hold10
DT-09352026-09-25L4EveningBearing or drive failureEquipment failure175
DT-04282026-09-25L2EveningFirst-off approval waitQuality hold14
DT-08482026-09-25L4DayOperator adjustmentMinor stop2
DT-03432026-09-25L2DayProduct changeoverChangeover55
DT-02502026-09-25L1NightJam at infeedEquipment failure7
DT-10102026-09-25L4NightBearing or drive failureEquipment failure71
DT-07652026-09-25L3NightWaiting for materialMaterial29
DT-09362026-09-24L4EveningSensor faultEquipment failure36